Home Blog Market Trends Green Buildings in India: What IGBC and GRIHA Ratings Mean and Whether to Pay More

Green Buildings in India: What IGBC and GRIHA Ratings Mean and Whether to Pay More

, Founder, Infratyke
· 5 min read
Quick answer

A green rating from IGBC or GRIHA certifies a building's design and construction, and in NCR it also earns the developer extra FAR, for example 9% to 15% in Haryana for IGBC Silver to Platinum. Pay a premium only for features that cut your running costs and are written into your agreement, and check who will run and pay for them after handover.

Key facts
Haryana, IGBC ratedExtra FAR 9% Silver, 12% Gold, 15% Platinum
Haryana, GRIHA ratedExtra FAR 3% to 15% (1 to 5 stars), not plotted residential
Uttar Pradesh, IGBC ratedExtra FAR 3% Silver, 5% Gold, 7% Platinum
Greater Noida (GNIDA)5% extra FAR free for IGBC Gold or above
Plan changes after bookingNeed written consent of two-thirds of allottees (RERA s.14(2))
In this article
  1. What do IGBC and GRIHA ratings mean?
  2. Why do developers want green ratings in NCR?
  3. Which green features actually save you money?
  4. Who pays to keep green systems running after handover?
  5. Can a developer drop green features after you book?
  6. Is the premium worth paying?
  7. Frequently asked questions

Developers often market a project as "green" and ask a higher price for it. Whether that premium is worth paying depends on what was certified, who gains from the certification, and whether the features will still work five years after handover. There is no official data on how much green-rated homes save on bills or sell for on resale, so treat any percentage in a brochure as a claim to test, not a fact.

What do IGBC and GRIHA ratings mean?

India's two widely used building rating systems are run by the Indian Green Building Council (IGBC) and the GRIHA Council. IGBC uses levels such as Silver, Gold and Platinum. GRIHA uses a one-star to five-star scale.

A rating is given to a building or project, not to your individual flat. Ask which rating the project holds, from which body, at what stage it was awarded and whether it covers the completed building. Ask for the certificate itself rather than relying on a logo on a hoarding.

Why do developers want green ratings in NCR?

Part of the answer is extra buildable area. Several NCR authorities give additional Floor Area Ratio (FAR) to rated buildings, which lets a developer build and sell more floor space on the same plot.

AuthorityRatingAdditional FAR
Haryana (Town and Country Planning Department, Haryana Building Code 2017, amendment of 8 May 2018)IGBC Silver / Gold / Platinum9% / 12% / 15%
Haryana (Haryana Building Code 2017)GRIHA 1 to 5 stars3%, 6%, 9%, 12%, 15% (not for plotted residential development)
Uttar Pradesh (Housing and Urban Planning Department)IGBC Silver / Gold / Platinum3% / 5% / 7%
Greater Noida Industrial Development AuthorityIGBC Gold or above5%, free of charge

These figures come from the IGBC and GRIHA incentive pages, which summarise the notifications. The binding terms are in each authority's notification. No equivalent incentive by DDA, MCD, the Noida Authority, YEIDA or GDA was found in the sources reviewed for this guide.

The point for a buyer: the developer already gains from the rating through extra FAR. A premium on top of that should be justified by features you will benefit from, not by the certificate alone. Our glossary entry on floor area ratio explains how FAR works.

Which green features actually save you money?

Savings come from what runs every day, not from the rating level. Check these on site and in the documents:

  • Building envelope. Insulated walls and roofs, shading on west and south faces, and window glazing cut cooling load. The Ministry of Power's ECO Niwas Samhita 2018 (the Energy Conservation Building Code for residential buildings) sets minimum envelope standards in Part I. Ask whether the design follows it.
  • Cooling equipment. If ACs are supplied, check the BEE label. Revised star rating norms took effect on 1 January 2026 and shifted ratings one level down, so a 2025 five-star AC is four-star on the new table. Since 1 January 2020, star-labelled room ACs must default to 24°C. See our AC selection guide.
  • Common area energy. Solar panels on the roof help only if they are sized for the common load and connected to it. Ask for the installed capacity and what it powers.
  • Water systems. Rainwater harvesting and sewage treatment plants need running costs and skilled operation. Ask who operates them after handover and how that is billed.

Who pays to keep green systems running after handover?

Usually the residents, through maintenance. In Uttar Pradesh, for example, section 18(1) of the UP Apartment Act, 2010 charges common expenses to owners in proportion to their undivided interest in the common areas. Once the association takes over, running the treatment plant, cleaning solar panels and servicing pumps become society costs. A resident welfare association can claim input tax credit on GST paid on capital goods such as generators and water pumps and on repair services (CBIC Circular 109/28/2019-GST), which softens the cost slightly where the RWA is GST-registered.

Under section 14(3) of the RERA Act, 2016, if you report a structural defect or a defect in workmanship, quality or provision of services within five years of possession, the promoter must fix it free within 30 days. A green system that was promised but does not work is worth raising within that window. Our guide to society maintenance charges shows how to read the bill, and housing society member rights covers what you can ask the association for.

Can a developer drop green features after you book?

Not freely. Section 14(2) of the RERA Act bars the promoter from making alterations or additions to the sanctioned plans, layout plans and specifications of the building or common areas without the written consent of at least two-thirds of the allottees, other than the promoter. If green features such as a solar installation or water treatment are in the specifications attached to your agreement, removing them needs that consent.

So the practical step is to get each green feature written into the agreement for sale or its specification schedule. A feature mentioned only in a brochure is much harder to enforce. Section 12 of the Act does give compensation for loss caused by a false statement in an advertisement or prospectus, but proving that loss takes time.

Is the premium worth paying?

Pay a premium only for what you can verify and will use. A simple test:

  1. Get the rating certificate and check its stage and issuing body.
  2. List the features that cut your own running costs (envelope, efficient equipment, solar on common load, water reuse).
  3. Check those features are in the agreement's specifications.
  4. Ask the developer for the expected maintenance cost of running them, in writing.
  5. Compare the premium with what you would spend fitting efficient ACs and fixtures yourself in a comparable non-rated flat.

If a project cannot answer those questions, the green label is mainly working for the developer. Use our list of questions to ask a builder and check the project's RERA registration first. Browse flats in Gurugram or Greater Noida, or post your requirement on Infratyke and mention that you want a rated project.

Frequently asked questions

How much extra FAR does Haryana give for IGBC-rated buildings?

Under the amendment to Chapter 6 of the Haryana Building Code 2017 dated 8 May 2018, Haryana's Town and Country Planning Department grants additional FAR of 9% for IGBC Silver, 12% for Gold and 15% for Platinum. GRIHA-rated buildings get 3% to 15% depending on stars, except plotted residential development. Check the notification for the binding terms.

Is a green rating given to my flat or to the whole building?

To the building or project. IGBC and GRIHA ratings, and the FAR incentives linked to them, attach to the building. Your flat benefits from features such as insulation, shading, solar power on common areas and water reuse, but how much depends on how the features are run after handover, which is usually the society's job.

Is ECO Niwas Samhita mandatory for housing projects?

That depends on whether your state has adopted it into its building rules, and no confirmation was found for Delhi, Haryana or Uttar Pradesh. ECO Niwas Samhita 2018 was launched by the Ministry of Power in December 2018 as the Energy Conservation Building Code for residential buildings, with Part I setting minimum envelope standards. Ask the developer whether the design complies.

Check the developer before you book: 481 developers with RERA-registered projects in Gautam Buddha Nagar district and 522 developers with RERA-registered projects in Gurugram district, from the Haryana and Uttar Pradesh RERA registers, with registration numbers and the official page for each project.

Sources

  • IGBC, Government incentives to IGBC rated green buildings
  • GRIHA Council, Haryana incentives page
  • IEA policy database, ECO Niwas Samhita 2018 (Ministry of Power)
  • PIB, Ministry of Power, 6 January 2020, on BEE star labelling for room ACs Press Information Bureau ↗
  • Business Today, 31 December 2025, on revised BEE star ratings from 1 January 2026
  • CBIC Circular No. 109/28/2019-GST, 22 July 2019 CBIC ↗
  • Real Estate (Regulation and Development) Act, 2016, sections 12 and 14 India Code ↗
  • UP Apartment (Promotion of Construction, Ownership and Maintenance) Act, 2010, section 18 India Code ↗
Facts last reviewed on 06 Nov 2026. Laws, rates and schemes change; check the official source before you act. How we check facts
Found this useful? Pass it on
RB
Written by
Rishabh Bitola
Founder, Infratyke

Rishabh Bitola is the founder of Infratyke, the real estate lead marketplace operated by Bitola Industries Pvt Ltd, which connects people looking to buy, rent or sell property in India with local agents.

Published 30 Oct 2026 · Facts reviewed 6 Nov 2026 · Editorial policy
Free for buyers, tenants and owners
Looking for a property in Gurugram?

Tell us what you need in 20 seconds. Local agents who work in your area call you with options.

  • No more than 3 agents get your number
  • You pay Infratyke nothing
  • Spam-checked before release

Your number goes only to the agents who take your requirement. Add an email and we will tell you who they are. Privacy

We use cookies to improve your experience and analyse site usage. By continuing to use Infratyke, you agree to our privacy policy.